EPA delays fines for lead-paint removal

HomeInside FCNewsEPA delays fines for lead-paint removal

HICKSVILLE, N.Y.—When the Environmental Protection Agency’s (EPA) RRP (Renovation, Repair and Painting) Rule took effect April 22 (FCNews, May 3/10), it signaled a sea of change across the industry regarding the issue of lead-paint removal.

Since that time, concerns have been raised by industry professionals regarding difficulties in obtaining the required firm certification and renovation worker training necessary to avoid fines that would have been levied on those not meeting the new requirements. As it turns out, industry professionals and renovators will not have to worry for the time being as the agency has decided to delay enforcement of its rule targeting work on homes built before 1978 until later in the year.

According to EPA assistant administrator Cynthia Giles, the agency “will not take enforcement action for violations of the certification until Oct. 1.” Enforcement will also be put off for renovation workers who have applied or enrolled in a class by Sept. 30 and complete that training by Dec. 31. Fines for not complying could be as high as $37,500 per day.

“In view of the paramount importance of ensuring that all contractors follow the lead-safe work practices in the RRP rule,” she added, “EPA will continue to enforce the work practice requirements in the rule, which protect children and reduce lead exposure.”

According to a report in Tulsa World, Sen. Susan Collins of Maine stated, “I appreciate that the EPA recognizes it must boost the number of certified trainers in each state, and small contractors need more time to comply with its rule.”

However, Collins also noted how efforts to rid lead-based paint from homes must continue. “Maine children are at particularly high risk for lead poisoning because more than 60% of our state’s homes were built before lead-based paint was banned in 1978.”

Gerry Swift, executive vice president of Potomac Floor Covering in Chantilly, Va., believes if the EPA measure had not been delayed, there would have been delays in some projects. “There were just too many projects that would have been put on hold as a result of not having enough contractors certified. And with the fines at $37,500 a day, the rule had to be delayed.

“The delay will now certainly allow most of my fellow contractors to get the certification, which is costly and time-consuming,” he explained. “We just didn’t have enough time. The delay was necessary.”

Chris Davis, president and CEO of the World Floor Covering Association (WFCA), believes it’s a good idea that the EPA postpone this until it gets a better chance to educate the public as to how this is going to be interpreted and what the impact will be. “In the short term, it’s fine, but the EPA is not talking about relaxing the rules. It is just postponing their implementation. It’s still going to go through; hopefully the public will be a little more educated as to what it really means before it has to be enforced.

“One of the things we’ve been trying to tell our members is the fines for non-compliance are significant,” he concluded. “If you are going to do this type of work, make sure you are certified. And if you are not already doing this type of work, it’s probably not a good idea [to start].”

Must Read

Registration for Mohawk Edge Summit 2024 opens soon

Denver—Mohawk’s Edge Summit is returning this year with a newly imagined customer experience at the Gaylord Rockies Resort and Convention Center here from December...

VitrA Tiles exhibits new innovations at Coverings

Atlanta—VitrA Tiles made its fourth appearance at this year’s Coverings exhibition here from April 22 to 25, 2024. Coverings is the premier tile...

FCEF takes two-pronged approach to training

The Floor Covering Education Foundation (FCEF) was established with the aim of promoting career opportunities in flooring installation, building pathways to training, supporting programs...

California senators who don’t think with ‘Clear’ heads

Spoiler alert: This column has nothing to do with flooring. But it does have to do with something that could affect you one day....

The A+ flooring products of 2023

In school an A+ signifies exceptional performance in the classroom or a subject, normally achieved by a minimum of students. In flooring, retailers hand...

Karndean elevates luxury vinyl with Ty Pennington partnership

Karndean has offered up highly stylized, ultra-realistic and unapologetically attainable luxury vinyl for the past 50 years. It’s safe to say it has done...
Some text some message..
X